![]() Generally, information systems were regarded as organic while real-time systems were embedded. the older version is now referred to as COCOMO 81.īoehm originally used mm (lor man-months) when he wrote Software Engineering Economics. The basic model was built around the equationīecause there is now a newer COCOMO II. Of these only seven were business systems and so they could be used with applications other than information systems. ![]() The term COCOMO really refers to a group of models.īochm originally based his models in the late 1970s on a study of 63 projects. ![]() ![]() Boehm's COCOMO (Constructive COst MOdel) is often referred to in the literature on software project management, particularly in connection with software estimating.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |